Project 240sx Overhaul Journal (Day 10)

Related Links

The front and rear suspension has been reinstalled with a few new goodies and the trunk is being prepped for the fuel cell. A new battery tray has been installed as well.

The new control arms for the 240sx
These are the new front and rear adjustable control arms.

The battery has been relocated in the 240sx’s engine bay for better weight distribution.
A custom mount was fabricated to relocate the battery closer to the chassis’ center of gravity.

The initial cut to make room for the fuel cell.
The rough cut of the sheet metal to make way for the new fuel cell. Still needs lots of prep.

By 240am

Follow

and keep up to date on the latest news and content.

Full Site Nav

Archives

The Crew @ Memphis International Raceway