Related Links
Today a new battery box was fabbed. I originally placed it on the frame rail but the clearances were a little too tight. It was relocated to the factory position. I also made a new mounting bracket for the liquid intercooler and went ahead and plumbed the heat exchanger back it. I plan on running this system for intercooling until I get the water injection installed.